"Load testing" and "proof load testing" are often used as if they mean the same thing. They don't. Mixing them up can leave a crane, hoist, or rigging assembly without the test that OSHA, your insurer, or your customer actually requires.
This guide explains how proof load testing and load testing differ, when each one is required, and what to look for in a provider.
Proof load testing applies a controlled load above an item's rated capacity, typically 125% for cranes, to prove it can safely carry its rated load. Load testing is the broader term for any test that applies a known load to verify performance, which can be at, below, or above the rated capacity. Every proof load test is a load test, but not every load test is a proof load test.
Load testing is any test that applies a known, measured force to equipment or a structure to confirm how it performs. The load can be applied with certified deadweights, water bags, hydraulic rams, or a calibrated load cell, depending on the item and the capacity.
Common types of load testing include:
Proof load testing is a specific type of load test. It applies a load above the rated capacity, then confirms the equipment carries it without permanent deformation, cracking, or failure. Passing the test "proves" there is a safety margin between the rated load and the load the equipment can actually handle.
For overhead and gantry cranes, OSHA caps the test load at 125% of the rated load unless the manufacturer recommends otherwise. Below-the-hook devices and rigging hardware follow their own ASME B30 and manufacturer requirements.
Proof load testing is non-destructive. The equipment goes back into service after it passes, along with a test certificate documenting the load applied and the results. Aldinger's proof load testing services cover cranes, hoists, rigging, and lifting fixtures.
|
Proof load testing |
Load testing (general) |
|
|---|---|---|
|
Test load |
Above rated capacity, typically 125% for cranes |
At, below, or above rated capacity, depending on the test |
|
Main purpose |
Prove a safety margin and confirm or establish the rated load |
Verify performance, function, or strength |
|
Destructive? |
No; equipment returns to service |
Usually no; break tests are the exception |
|
Typical triggers |
New install, alteration, major repair, re-rating |
Periodic checks, commissioning, troubleshooting, product development |
|
Typical equipment |
Cranes, hoists, below-the-hook devices, slings, shackles, lifting fixtures |
All of those, plus structures, anchors, fall protection, and load-bearing components |
|
Documentation |
Test certificate with load applied and pass/fail result |
Test report; format depends on the test and the standard |
Schedule a proof load test when the equipment's load rating needs to be established or re-confirmed:
A rated load or functional load test usually fits these situations:
If you're not sure which test applies, start with the manufacturer's instructions and your applicable standard. A qualified provider of load testing services can help you match the test to the requirement.
The requirement depends on the equipment. These are the most common references for lifting equipment in the U.S.:
|
Equipment |
Key requirement |
Test load |
|---|---|---|
|
Overhead and gantry cranes |
OSHA 29 CFR 1910.179(k) requires a rated load test before first use of new and altered cranes |
Up to 125% of rated load, unless the manufacturer recommends otherwise |
|
Below-the-hook lifting devices |
ASME B30.20 covers testing of spreader beams, lifters, and similar devices |
Typically 125% of rated load, per the standard and manufacturer |
|
Slings |
OSHA 29 CFR 1910.184 and ASME B30.9 cover proof testing of new, repaired, and fabricated slings |
Varies by sling type; set by the standard and manufacturer |
OSHA has clarified that employers must perform rated load tests on new and altered cranes, and that test reports must be kept on file where appointed personnel can access them.
Your industry, customer contracts, or insurer may add stricter requirements. Always confirm the test load with the manufacturer's specification before testing.
A typical proof load test follows five steps:
The right load testing company should be able to show you more than a truck and some weights. Look for:
What is the difference between a proof load test and a load test?
A proof load test applies a load above the rated capacity to prove a safety margin. A load test is any test that applies a known load, at, below, or above capacity, to verify performance.
What percentage is a proof load test?
For overhead and gantry cranes, the test load is up to 125% of the rated load under OSHA 1910.179, unless the manufacturer recommends otherwise. Other equipment follows its own ASME standard and manufacturer specification.
Is proof load testing destructive?
No. Proof load testing is designed to stay within the equipment's safe limits, so equipment that passes goes back into service. Break testing to failure is a separate, destructive test.
How often is proof load testing required?
Proof load testing is generally required before first use and after any alteration, re-rating, or repair to a load-bearing component. Periodic intervals depend on your standard, insurer, and manufacturer.
Does OSHA require load testing for cranes?
Yes. OSHA requires rated load tests on new and altered overhead and gantry cranes before initial use, with test reports kept on file.
Where can I find load testing services near me?
Aldinger provides on-site proof load testing primarily in Dallas–Fort Worth, Houston, and Little Rock.
Whether you're commissioning a new crane, returning repaired rigging to service, or preparing for an audit, Aldinger's proof load testing services give you the documented results you need.
Aldinger offers on-site proof load testing primarily in Dallas–Fort Worth, Houston, and Little Rock, with:
Schedule proof load testing or contact your nearest Aldinger location to confirm coverage for your area.